I noted Mississauga Rd is being built north of Queen street. Being made quite a bit wider....I saw something and did not know what it was.
On the west side , they have a gravel bed down over maybe two or three lanes. Lying roughly where the west curb will be is about a 8 inch metal tube..running several hundred feet. It appears capped at each end.
Along it's length every few feet there is about a 2 inch pipe tied to the 8 inch pipe. These seem to be regular rubber hoses that appear To come off and twist down into the ground below grade. Dozens of them along the length of the 8 inch metal pipe.
Are they pressure testing? Injecting? Excavating? I could not for the life of me figure out why this pipe was laying exposed with all these small pipes coming off into the ground?
Anyone know?
On the west side , they have a gravel bed down over maybe two or three lanes. Lying roughly where the west curb will be is about a 8 inch metal tube..running several hundred feet. It appears capped at each end.
Along it's length every few feet there is about a 2 inch pipe tied to the 8 inch pipe. These seem to be regular rubber hoses that appear To come off and twist down into the ground below grade. Dozens of them along the length of the 8 inch metal pipe.
Are they pressure testing? Injecting? Excavating? I could not for the life of me figure out why this pipe was laying exposed with all these small pipes coming off into the ground?
Anyone know?





